Free loop check sheet template (Excel-ready)
Before a loop check starts, someone hands you the I/O list and asks for the same thing back: which loops are done, which failed, and what percentage is signed off. The loop check sheet is where that answer lives. Here are the columns that actually hold up on a live project, and a free template you can open in Excel in a minute.
Download the template
The template comes as a CSV that opens directly in Excel or Google Sheets, with a handful of example rows filled in so the intent of each column is obvious — the tags and results below are sample data, not a real project.
Download the loop check sheet template (CSV)The columns, and why each one earns its place
- Tag
- The instrument tag from the I/O list — AI-101, DO-302. One row per tag, never merged cells.
- Service description
- What the signal is, in words: “Reactor level transmitter LT-101 to DCS”. Copy it from the I/O list so the sheet reads alone.
- Signal type
- 4–20 mA, HART, 24 V DC discrete — it tells you which test applies before you walk to the field.
- Status
- Not started / Loop test / Signed off. The project manager asks for exactly this count.
- Tested date
- The day you actually tested it, not the day you typed it in. It is the only way to reconstruct progress later.
- Result
- Pass / Fail. Keep it binary; the detail goes in Notes.
- Punch item ref
- If the loop failed, the punch item gets a reference so “3 failed loops” and “open punch” tell the same story.
- Evidence
- Photo of the terminal, screenshot of the DCS faceplate. A file name or photo reference is enough.
- Notes
- Span values, stroke percentages, what you suspect. Future you, two weeks from now, will need it.
How to fill it in without it falling apart
- Work row by row, tag by tag, in the field or at the DCS — not from memory at the end of the day. The sheet is only honest if the date is the test date.
- Keep the percentages out of the sheet. They are derived: count the rows. A hand-typed percentage always drifts from its own data.
- Failures go straight to the punch column the moment they happen, with a photo. A failed loop without evidence becomes an argument at handover.
- Never delete a row. A tag that was removed from the scope gets a note, not a deletion — scope changes need to leave a trail.
Where this sheet ends
The template above is the honest baseline, and for a one-week job it may be all you need. The cost shows up on longer jobs: the report for the project manager is still rebuilt by hand from this sheet, the photos live on your phone instead of in the row that failed, and nothing works offline in a control room with weak signal. LoopSync starts from this exact list instead — you import the Excel I/O list, close out tags as you test, and the progress report is exported, always current, from the work itself. The free plan carries one project with up to 100 I/O.